ANNEX 5

 

SUMMARY OF BUDGETS AND ANNEXES

 

Annex Description

2022/23

£

STREET LIGHTING STRUCTURAL STEEL INTEGRITY TESTING @ 2500 (3% est failures x  75)

£75,000 est

 

Knavesmire Road (@29)  steel column replacements from structural failure 22/23

 

£34,000

 

 

STRUCTURAL STEEL TESTING: taking place city wide (Appendix 6 will be filled with this program when known)

 

Expecting 3% @ failures so around x 75 new replacement steel columns from the 2700 tested.

 

 

 

Knavesmire road replacement scheme:

 

KNAVESMIRE ROAD

SL

1

KNAVESMIRE ROAD

SL

10

KNAVESMIRE ROAD

SL

11

KNAVESMIRE ROAD

SL

12

KNAVESMIRE ROAD

SL

13

KNAVESMIRE ROAD

SL

14

KNAVESMIRE ROAD

SL

15

KNAVESMIRE ROAD

SL

16

KNAVESMIRE ROAD

SL

17

KNAVESMIRE ROAD

SL

18

KNAVESMIRE ROAD

SL

19

KNAVESMIRE ROAD

SL

2

KNAVESMIRE ROAD

SL

20

KNAVESMIRE ROAD

SL

21

KNAVESMIRE ROAD

SL

22

KNAVESMIRE ROAD

SL

23

KNAVESMIRE ROAD

SL

24

KNAVESMIRE ROAD

SL

25

KNAVESMIRE ROAD

SL

26

KNAVESMIRE ROAD

SL

27

KNAVESMIRE ROAD

SL

3

KNAVESMIRE ROAD

SL

4

KNAVESMIRE ROAD

SL

5

KNAVESMIRE ROAD

SL

6

KNAVESMIRE ROAD

SL

7

KNAVESMIRE ROAD

SL

8

KNAVESMIRE ROAD

SL

9